Syndetics cover image
Image from Syndetics

How to run successful high-tech project-based organizations [electronic resource] / Fergus O'Connell.

By: O'Connell, Fergus.
Material type: TextTextSeries: Artech House computing library: Publisher: Boston : Artech House, c1999General Notes: Available through the EBSCO e-book Collection, which can be found on the Davenport University Library database page.Bibliography: Includes bibliographical references (p. 265-266) and index.Description: 1 online resource (xix, 280 p.) : ill.ISBN: 1580532195 (electronic bk.); 9781580532198 (electronic bk.).Subject(s): High technology industries -- Management | Project managementGenre/Form: Electronic books DDC classification: 620/.0068 Online resources: Access full-text materials at no charge:
Contents:
"Fixing" Projects -- The 10 Steps -- PSI -- Assigning PSIs -- Interpreting PSIs -- Magicians vs. Dukes of Wellington [step 5(b)] -- Objections -- People (steps 4 and 6) -- Why projects fail -- Scoping Projects and Making Plans (Steps 1-5) -- Scoping the project (step 1) -- Making the plan (steps 2-5) -- List of jobs -- The power of assumptions -- One leader -- Assign people to jobs -- Put contingency into the plan -- Document the plan -- Present the plan -- Agree on next actions -- Running Projects (Steps 6-10) -- Monday meetings -- Daily routine -- Code green -- Code yellow -- Code orange -- Code red -- Status reporting -- Assessing Project Plans (Steps 1-5) -- Assessing Projects (Steps 1-10) -- Rescuing Projects: Rescuing = Assessing + Scoping and Planning (Steps 1-10) -- Auditing Completed Projects (Steps 1-10) -- Running Multiple Projects -- Organization-wide supply and demand -- Organization-wide project assignment -- Personal dance cards -- Building a Historical Database (Knowledge Management) -- Data -- Information -- High-level estimates and actuals -- Templates for projects -- Project performance information -- Knowledge -- Analyzing Project Management Processes (Steps 1-10) -- Comparing your methodology/procedures with the 10 steps -- Adapting existing project management infrastructure/tools -- User assistance -- Managing Subcontractors -- Planning -- Choosing the subcontractor -- Writing the contract -- Execution of the plan -- Implementing Structured Project Management in Organizations (iSPMiO).
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

Includes bibliographical references (p. 265-266) and index.

Available through the EBSCO e-book Collection, which can be found on the Davenport University Library database page.

"Fixing" Projects -- The 10 Steps -- PSI -- Assigning PSIs -- Interpreting PSIs -- Magicians vs. Dukes of Wellington [step 5(b)] -- Objections -- People (steps 4 and 6) -- Why projects fail -- Scoping Projects and Making Plans (Steps 1-5) -- Scoping the project (step 1) -- Making the plan (steps 2-5) -- List of jobs -- The power of assumptions -- One leader -- Assign people to jobs -- Put contingency into the plan -- Document the plan -- Present the plan -- Agree on next actions -- Running Projects (Steps 6-10) -- Monday meetings -- Daily routine -- Code green -- Code yellow -- Code orange -- Code red -- Status reporting -- Assessing Project Plans (Steps 1-5) -- Assessing Projects (Steps 1-10) -- Rescuing Projects: Rescuing = Assessing + Scoping and Planning (Steps 1-10) -- Auditing Completed Projects (Steps 1-10) -- Running Multiple Projects -- Organization-wide supply and demand -- Organization-wide project assignment -- Personal dance cards -- Building a Historical Database (Knowledge Management) -- Data -- Information -- High-level estimates and actuals -- Templates for projects -- Project performance information -- Knowledge -- Analyzing Project Management Processes (Steps 1-10) -- Comparing your methodology/procedures with the 10 steps -- Adapting existing project management infrastructure/tools -- User assistance -- Managing Subcontractors -- Planning -- Choosing the subcontractor -- Writing the contract -- Execution of the plan -- Implementing Structured Project Management in Organizations (iSPMiO).

Description based on print version record.

There are no comments on this title.

to post a comment.

Powered by Koha